Nomination
Historical Commission
- Vote tally
- <UNKNOWN>
Decisions, votes, testimony, and links back to source minutes.
Source links open full minutes. Exact passages have not been matched to these records.
Historical Commission
Architectural Committee
Committee recommendations are not final Commission decisions.
Exterior work to include roof repairs, clearing of building, repointing of joints and waterproof sealer application, Masonry not to be sandblasted; Western Waterproofing Company to be contacted for less abrasive cleaning method, Saw cutting of masonry joints to be eliminated, Raking of joints to be done by hand, Two contractors to prepare sample section to determine best method of cleaning and repointing, Herbert W. Levy to review specifications regarding water-repellent coating on stone and report recommendations
Architectural Committee
Committee recommendations are not final Commission decisions.
Approval in concept of: Revised Scheme C main-facade doors (replicated 1876 bronze and iron doors) and new windows based on 1921 configuration without concrete infill; corner pavilion windows restored to 1876 appearance; carousel addition location/size/connection/overall appearance (not exterior details); removal of non-historic stairs, doors, and ramps and restoration of associated areas; two emergency exits near grade on west facade; redesigned drop-off lots with paving matching central walkway; school bus drop-off road and main parking lot; plaza restoration between branches of Concourse. Further study required before decision on regrading for sidewalks to main entrance and closing of north branch of Concourse.
Architectural Committee
Committee recommendations are not final Commission decisions.
West niche banners reduced in size; staff to review details
Prior meeting reference: 10 October 2003 in-concept approval by Historical Commission