Alteration review
Architectural Committee
Committee recommendations are not final Commission decisions.
Recorded conditions
Original iron rails to circular steps to be repaired or replaced with similar ironwork, Inappropriate pipe railing to cellarway to be replaced with suitable ironwork if bulkhead not original, Door and shutters as indicated on separate sheet are approved, Brick sills should be wood or stone, not brick
- Criteria cited
- Original ironwork preservationDoor and shutter design approvalConstruction period 1828-1830