Alteration review
Historical Commission
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Recorded conditions
Applicant to return to Committee with details on glass-wall connection between old and new buildings, base-level materials (stone or stone-like), graphic depiction of materials, and large metal spandrel panels for further conceptual approval review
Prior meeting reference: Architectural Committee Meeting, 29 March 1994; Previous design submitted November 1993
- Vote tally How to read this
- unanimous
- Criteria cited
- Integration with existing buildingDesign improvement
Votes and testimony
Votes
How to read this- Arlene Matzkinyes
- David Brownleeyes
- Scott Wildsyes
- Stephanie Wolfyes