Committeepeople for Ward 5, Division 2 are on the City Commissioners' list. Ward leaders are elected by their party's committeepeople. Committeepeople lists(opens in a new tab)
These are the neighborhood schools for this address. Special admission schools are not included. Report cards open on psdreportcard.com, an independent site.
Meets at Pennsylvania Hospital (Zubrow Auditorium)
800 Spruce Street
Philadelphia, PA 19107
Unless another location is specified for a particular meeting.
Designation status and decisions from the historic property record.
14 decisions
Historic address
230 232 AND 234-36 SOUTH. 4TH STREET, 238 SOUTH FOURTH STREET, 6008 WAYNE AVENUE (STREET. PETER'SOUTH CHURCH) — REMOVAL OF BISHOP WHITE STAINED GLASS WINDOW AND RELOCATION TO CHURCH HOUSE 240 SOUTH. 4TH STREET, 238-240 SOUTH. 4TH STREET, 230 232 234-36 SOUTH 4TH STREET, 240 SOUTH. 4TH STREET (CHURCH HOUSE), 238 SOUTH 4TH STREET, 238 SOUTH. 4TH STREET
Year built
1829
Building description
ROW 3.5 STY MASONRY
Owner
HOHNS ANDREW S / POPOWICH LEAH A
Source links open full minutes. Exact passages have not been matched to these records.
Alteration review
Architectural Committee
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Window to be moved eight inches toward middle window; elevation showing two doors and a window approved
Outcome, as read from the minutes:DeniedRead from the minutes by software. How to read this
Prior meeting reference: Architectural Committee meeting, 24 November 2009; prior Commission legalization of removal of four Violet Oakley and Tiffany windows
Society Hill Civic Associationsupport, organization
Tom Kundigsupport, person
Alteration review
Architectural Committee
Outcome, as read from the minutes:No decisionRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Staff recommends retaining rear ell sections Number 1 and Number 5 (piazzas); staff has not yet visited the site to assess the ells fully; proposed additions satisfy new construction section of Standard 9.
Prior meeting reference: Architectural Committee July 2019 (first concept, withdrawn); Architectural Committee August 2019 (second concept, denied); Historical Commission 11 October 2019 (third concept remanded to Architectural Committee)
Society Hill Civic Associationneutral, organization
Alteration review
Historical Commission
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Recorded conditions
Historic rear sections of the buildings must be documented before removal
Prior meeting reference: First in-concept reviewed July 2019 (withdrawn); second in-concept reviewed August 2019 (AC recommended denial); third design remanded at October 11, 2019 Historical Commission meeting to AC for review at October 22, 2019 AC meeting
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Rear sections being removed must be documented and copy provided to Historical Commission; window replacement must comply with Historical Commission's review criteria and policies; new chimney clad in brick and compatible with historic chimneys; connections between additions and historic buildings carefully designed; roof framing retained or structure stabilized before removal and replacement.
Prior meeting reference: November 2019 approval in concept by Philadelphia Historical Commission
Society Hill Civic Associationsupport, organization
Alteration review
Historical Commission
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Recorded conditions
Removed sections documented; replacement windows satisfy standards; new chimney clad in brick; roof framing retained or structure stabilized before reframing; dormers retained; staff to review details
Prior meeting reference: Historical Commission approved application in concept November 2019