civus

ZBA appeal 34272 at 1314-32 SPRING GARDEN ST

Dataset record from L&I appeals, Oct 3, 2018

Appeal 34272

Decided
TypeRB_ZBA
GroundsPERMIT FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE, FOR THE ERECTION OF AN ATTACHED STRUCTURE, FOR THE CREATION OF FIVE(5) TENANT SPACES ( RETAIL SPACE # 1, SPACE# 2, SPACE# 3, SPACE# 4 AND SPACE # 5) ; FOR THE ERECTION OF FIVE(5) FLATWALL SIGNS ( SIGN # A) ( 37 SF) AND FOR THE ERECTION OF FIVE(5) MARQUE SIGNS ( SIGN# B)( 3 SF) ( SPRING GARDEN FRONTAGE ) ACCESSORY TO VACANT TENANT SPACES ( USE REGISTRATION PERMIT REQUIRED PRIOR TO OCCUPANCY ); FOR THE ERECTION OF A ONE(1) FLATWALL SIGN( 275 SF AREA) ABOVE THE SECOND FLOOR WINDOW SILL , FOR THE ERECTION OF ONE(1) FLATWALL SIGN ( 100 SF AREA) ACCESSORT TO MOVING AND STORAGE FACILITY ( ALONG SPRING GARAND FRONTAGE) WITH TWELVE(12) OFF-STREET PARKING SPACES IINCLUDING WITH ONE(1) ACCESSIBLE SPACE AND ONE(1) LOADING SPACE AND WITH TWELVE(12) BICYCLE SPACES IN AN ACCESSIBLE ROUTE AT FIRST FLOOR SIZE AND LOCATION AS SHOWN IN THE APPLICATION.
Address1314-32 SPRING GARDEN ST
Hearing dateOct 3, 2018
DispositionGranted Classified from the decision text by software. How to read this
Decision textGRANTED/PROV
Provisos1.Curb cuts, trash and recycling receptacles, bollards as per plans by Langan Engineer dated 5/21/18. 2. Venting through the roof. 3. First floor for retail use only.
AppellantBRETT FELDMAN, ESQ (as listed by the City)
Owner of recordSPRING GARDEN PARKING ASSOC (as listed by the City)
Related permitDescription of Project: 882676 APPEAL TYPES==> APPEAL TYPE: USEVAR APPEAL TYPE: ZONEVAR BOARD DECISIONS==> DECISION: CONTINUED DECDATE: 29-AUG-18 PROVISO: ATTORNEY MOVING PARTY DECISION: GRANTED/PROV DECDATE: 03-OCT-18 PROVISO: 1.Curb cuts, trash and recycling receptacles, bollards as per plans by Langan Engineer dated 5/21/18. 2. Venting through the roof. 3. First floor for retail use only. COURT APPEALS==>

Names appear as the City lists them in its record. To ask for a correction or removal, write to hello@civus.org or read how corrections work.

RCO meetings