Alteration review
Architectural Committee
Outcome, as read from the minutes:DeferredRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Further study of the proposed areaway and preparation of more detailed drawings; installation of a second entrance rail to the first floor to match existing rail; new railing around the areaway to follow same design
Votes and testimony
Testimony
- Victoria Pyleneutral, person