Committeepeople for Ward 5, Division 16 are on the City Commissioners' list. Ward leaders are elected by their party's committeepeople. Committeepeople lists(opens in a new tab)
These are the neighborhood schools for this address. Special admission schools are not included. Report cards open on psdreportcard.com, an independent site.
Designation status and decisions from the historic property record.
7 decisions
Historic address
249-53 ARCH STREET
Year built
1902
Building description
OFF BLD COM NO GAR MASON
Owner
ATLANTIS INVESTMENTS LLC
Source links open full minutes. Exact passages have not been matched to these records.
Alteration review
Architectural Committee
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
New opening for second means of egress to be placed in east wall, presently stuccoed, leading into Betsy Ross garden, Permission to install window on east elevation to be requested from Department of Licenses and Inspections
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Stair penthouse redesigned with simpler massing, fewer materials, and more neutral colors; signage attached into masonry joints; planters removable and have internal drainage; staff to review details
Outcome, as read from the minutes:No decisionRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Staff to review mock-up of rooftop addition and deck railing (ideally before Commission meeting) to confirm addition is inconspicuous from public right-of-way and Betsy Ross House; deck railing to be pulled back from east elevation; mechanical equipment placement to be studied and made inconspicuous; ADA ramp design to be reconsidered with study of sidewalk resloping option; materials for addition to be matte finish metal panel system.
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Revised ramp approved; lighting approved with addition of flange for screening SL2 fixture if necessary, conduit and fixtures to be inconspicuous from public right-of-way; signage approved as either Option 2 or Option 1 with a single plaque with four points of penetration.
Prior meeting reference: August 2016 Architectural Committee meeting