Committeepeople for Ward 5, Division 19 are on the City Commissioners' list. Ward leaders are elected by their party's committeepeople. Committeepeople lists(opens in a new tab)
These are the neighborhood schools for this address. Special admission schools are not included. Report cards open on psdreportcard.com, an independent site.
Meets at Pennsylvania Hospital (Zubrow Auditorium)
800 Spruce Street
Philadelphia, PA 19107
Unless another location is specified for a particular meeting.
Designation status and decisions from the historic property record.
9 decisions
Historic address
SOCIETY HILL SYNAGOGUE 418 SPRUCE STREET, 426 SPRUCE STREET, 418 SPRUCE STREET (SOCIETY HILL SYNAGOGUE), SOCIETY HILL SYNAGOGUE SPRUCE STREET, 418 SPRUCE STREET (SOCIETY HILL SYNAGOGUE ROWHOUSE), 418 SPRUCE STREET
Year built
1906
Building description
HSE WORSHIP ALL 1 STY MAS
Owner
SOCIETY HILL SYNAGOGUE
Source links open full minutes. Exact passages have not been matched to these records.
Alteration review
Architectural Committee
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Outcome, as read from the minutes:DeferredRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Transformer installation must be relocated; most desirable placement is in synagogue basement with no visible impact; second most desirable location is rear southeast corner of property; HVAC units and ductwork must be placed in less visible location; holes cut in south wall without required building permit must be addressed
Outcome, as read from the minutes:DeferredRead from the minutes by software. How to read this
Recorded conditions
Deferred to June meeting; Architectural Committee to review revised plans at public meeting on 31 May 1990. PECO to meet with Synagogue and Commission to attempt resolution. Existing concrete pad and protective wall deemed unacceptable. Preferred solution: transformer in basement; second preference: rear southeast corner of property. Proposed HVAC location in south wall also deemed unacceptable; architects to explore alternatives.
Prior meeting reference: Architectural Committee meeting 26 April 1990
Criteria cited
Visual impact on historic buildingImpact on adjacent walkway (Lawrence Walk)Desirability of subterranean or interior installation
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Electrical transformer to be installed beneath sidewalk on Spruce Street per PECO agreement; HVAC ductwork to be installed with holes patched with original bricks; split system HVAC on roof of new building not visible from Lawrence Walk
Prior meeting reference: 26 April 1990 and 9 May 1990 meetings
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Committee recommendations are not final Commission decisions.
Recorded conditions
Exterior lights are not obtrusive; mechanical units are inconspicuous and acoustically shielded; the rainwater conductor is redesigned; the glass is clear; and points of intrusion into the historic buildings are minimized, with staff to review details.
Prior meeting reference: Historical Commission meeting of 13 July 2007 — concept approval for a more extensive prior proposal
Outcome, as read from the minutes:ApprovedRead from the minutes by software. How to read this
Recorded conditions
Exterior lights not obtrusive; mechanical units inconspicuous and acoustically shielded; rainwater conductor redesigned; glass is clear; points of intrusion into historic buildings minimized; staff to review details
Prior meeting reference: 13 July 2007 meeting (concept approval)